{"id":139687,"date":"2019-01-27T22:48:43","date_gmt":"2019-01-28T04:48:43","guid":{"rendered":"http:\/\/www.metrostlouis.org\/?page_id=139687"},"modified":"2025-10-15T08:54:11","modified_gmt":"2025-10-15T13:54:11","slug":"contractor-resources","status":"publish","type":"page","link":"https:\/\/www.metrostlouis.org\/contractor-resources\/","title":{"rendered":"Contractor Resources"},"content":{"rendered":"<p>The attachments below must be followed and all requirements fulfilled before permission will be granted to any individual or group requesting access to the MetroLink Right-of-Way (ROW) to perform work. This includes all work on, under, above or adjacent to the MetroLink Right-of-Way that has the potential to impact train operations.<\/p>\n<h3>Right of Way (ROW) Access:<\/h3>\n<ul style=\"list-style: none; color: #005cb9;\">\n<li><i class=\"fa fa-file-pdf-o\" aria-hidden=\"true\"><\/i> <a href=\"https:\/\/www.metrostlouis.org\/wp-content\/uploads\/2025\/02\/SOP-101.17-Work-Performed-on-MetroLink-Right-of-Way-Dec2023.pdf\"><span style=\"color: #333399;\"><strong>SOP 101-17 Work Performed on MetroLink Right-of-Way<\/strong><\/span><\/a><\/li>\n<li><span style=\"color: #000000;\"><em><span style=\"color: #800000;\"><strong>Note:<\/strong> <\/span>SOP 101-17 is currently undergoing revisions with fee upgrades and changes. These changes will go into effect on <strong>March 1, 2025<\/strong>. Stay tuned for more details when revisions are completed in February.<\/em><\/span><\/li>\n<li><\/li>\n<li><i class=\"fa fa-file-pdf-o\" aria-hidden=\"true\"><\/i> <strong><a href=\"https:\/\/www.metrostlouis.org\/wp-content\/uploads\/2025\/02\/SOP-101.23-Permit-Numbers-Track-Allocation-2023.pdf\"><span style=\"color: #333399;\">SOP 101-23 Permit Numbers and Track Allocation<\/span><\/a><\/strong><\/li>\n<li><a style=\"color: #005cb9;\" href=\"https:\/\/www.metrostlouis.org\/wp-content\/uploads\/2019\/01\/JHA-Submission-Form.pdf\" target=\"blank\" rel=\"noopener\"><i class=\"fa fa-file-pdf-o\" aria-hidden=\"true\"><\/i> <strong><span style=\"color: #333399;\">JHA Submission Form<\/span><\/strong><\/a><\/li>\n<li><i class=\"fa fa-file-pdf-o\" aria-hidden=\"true\"><\/i> <a href=\"https:\/\/www.metrostlouis.org\/wp-content\/uploads\/2025\/10\/SOP-101.17-EXHIBIT-B-Metro-Permit-Fee-Schedule-2025.pdf\"><span style=\"color: #333399;\"><strong>Fees Schedule<\/strong><\/span><\/a><\/li>\n<li><i class=\"fa fa-file-pdf-o\" aria-hidden=\"true\"><\/i> <span style=\"color: #333399;\"><a style=\"color: #333399;\" href=\"https:\/\/www.metrostlouis.org\/wp-content\/uploads\/2025\/02\/SOP-101.17-EXHIBIT-D-ML-RIGHT-OF-ENTRY-SPECS-Sept2022.pdf\"><strong>Indemnification Agreement and Insurance Coverage<\/strong><\/a><\/span><\/li>\n<li><i class=\"fa fa-file-pdf-o\" aria-hidden=\"true\"><\/i> <a href=\"https:\/\/www.metrostlouis.org\/wp-content\/uploads\/2025\/10\/BSD-Contractor-Safety-Action-Plan-rev-10.1.2025.pdf\"><span style=\"color: #333399;\"><strong>Contractor Safety Action Plan<\/strong><\/span><\/a><\/li>\n<li><i class=\"fa fa-file-pdf-o\" aria-hidden=\"true\"><\/i> <strong><span style=\"color: #333399;\"><a style=\"color: #333399;\" href=\"https:\/\/www.metrostlouis.org\/wp-content\/uploads\/2020\/09\/SOP-101.17-A-Contractor-Work-Permit.pdf\">Contractor Right-of-Way Work Permit<\/a><\/span><\/strong><\/li>\n<\/ul>\n<p>Email all completed forms to: <a href=\"mailto:rowworkpermits@metrostlouis.org\">rowworkpermits@metrostlouis.org<\/a><\/p>\n<p>Please contact the Permit Coordinator at 314-575-1236 with any questions.<\/p>\n<h3>Real Estate Inquiries:<\/h3>\n<p><strong>Bill Waggoner<\/strong><br \/>\nActing Director of Real Estate<br \/>\n<a href=\"mailto:wswaggoner@bistatedev.org\">wswaggoner@bistatedev.org\u00a0<\/a><\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The attachments below must be followed and all requirements fulfilled before permission will be granted to any individual or group requesting access to the MetroLink Right-of-Way (ROW) to perform work. This includes all work on, under, above or adjacent to the MetroLink Right-of-Way that has the potential to impact train operations. Right of Way (ROW) [&hellip;]<\/p>\n","protected":false},"author":21,"featured_media":0,"parent":0,"menu_order":164,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-139687","page","type-page","status-publish","hentry"],"acf":[],"jetpack_sharing_enabled":true,"featured_media_urls":[],"_links":{"self":[{"href":"https:\/\/www.metrostlouis.org\/wp-json\/wp\/v2\/pages\/139687","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.metrostlouis.org\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.metrostlouis.org\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.metrostlouis.org\/wp-json\/wp\/v2\/users\/21"}],"replies":[{"embeddable":true,"href":"https:\/\/www.metrostlouis.org\/wp-json\/wp\/v2\/comments?post=139687"}],"version-history":[{"count":0,"href":"https:\/\/www.metrostlouis.org\/wp-json\/wp\/v2\/pages\/139687\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.metrostlouis.org\/wp-json\/wp\/v2\/media?parent=139687"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}